This bridge was built for the ALEbricks(www.alebricks.com) event in May 2014.
This is a reduced version of my last bridge(Cable-stayed bridge (TrenBrick 2013)).
The new bridge has a overall length of 12 base-plates, that is 384 studs (307cm or 121 in.)
Both towers are identical, and the distance between them is 184 studs.
The total height is 120 cm(47 in.).
A little video of the bridge and the event:
Enjoy it!!
Cool!!!
ReplyDeleteReally nice. Twice as better even in smaller size. ^^
ReplyDeleteWhy smaller ? bigger is even better or are you out of butget
ReplyDeleteIn this event the city display was smaller, so the original bridge would have been too big and out of scale
ReplyDeleteWhy there is a fan in the city?
ReplyDeleteThr fan is a PC power supply to give the power to the 9V train circuit
ReplyDelete