Complete sets

COMPLETE SETS OF MY MOCs AVAILABLE, WITH INSTRUCTIONS AND ALL PARTS. Just go to SETS page, or click HERE

Tuesday, July 15, 2014

Cable-stayed bridge 2 (ALEbricks 2014)

One more bridge to the collection.

This bridge was built for the ALEbricks(www.alebricks.com) event in May 2014.

This is a reduced version of my last bridge(Cable-stayed bridge (TrenBrick 2013)).




The new bridge has a overall length of 12 base-plates, that is 384 studs (307cm or 121 in.)


Both towers are identical, and the distance between them is 184 studs.


The total height is 120 cm(47 in.).

 



  

A little video of the bridge and the event:



Enjoy it!!

6 comments:

Anonymous said...

Cool!!!

Blastem said...

Really nice. Twice as better even in smaller size. ^^

Anonymous said...

Why smaller ? bigger is even better or are you out of butget

Sheepo said...

In this event the city display was smaller, so the original bridge would have been too big and out of scale

Anonymous said...

Why there is a fan in the city?

Sheepo said...

Thr fan is a PC power supply to give the power to the 9V train circuit

Post a Comment