Complete sets

COMPLETE SETS OF MY MOCs AVAILABLE, WITH INSTRUCTIONS AND ALL PARTS. Just go to SETS page, or click HERE

Thursday, September 11, 2014

Bridge Layer XL


To avoid any confusion the first thing I want yo say is that this MOC is old, it passed away many years ago.

I desing this MOC to enter in a competition organized by a store in Madrid in March 2010.

This creation can cross a free space between 80 and 105 cm.



It is powered by 6 PF motors, 3 IR recevers and PF AA battery.

- 2M motors for drive, one for each side
- XL motor for the first elevation step
- M motor for the couterweigh
- XL motor for the second elevation step
- M motor to open the bridge

Here the complete secuence to cross a

Step 1 - Place the bridge layer close to the precipice

Step 2 - Lift the first step of the bridge

Step 3 - Open the counterweight

Step 4 - Open the bridge

Step 5 - Lower the complete bridge

Step 6 - Go back a little to drop the bridge

Step 7 - Lift a little bit the main arm

Step 8 - Cross the bridge!!. The deformation of the bridge is done deliberately to reduce the bridge swing. Without that deformation the bridge becomes unstable.


 Step 9 - Make a 180 degrees turn.

Step 10 - Lower the main arm and go on a little to connect the arm to the bridge.

Step 11 - Lift the bridge and repeate the steps 1 to 4 in the oposite order.


Unfortunately I don't have more picture or files, but here you a little video in action!!



Enjoy it!!

1 comment:

Enrique Diaz said...

Espectacular, soberbio, genial...

No hay palabras para describrlo.

Existe algún archivo LDD que recoja el proceso?

Post a Comment